The lead time on a bespoke commission is the period between an approved brief and the piece installed on site: for most bespoke furniture it runs ten to twenty weeks, longer for joinery fit-outs or specialist craftsmanship.

The question that arrives earliest, and usually with a date attached, is some version of "when can I have it?" A client has a dinner planned, a hotel has an opening, a family is moving back into a house that has been gutted to the brick. The honest answer is rarely the quick one, and learning to give it well — early, plainly, with the reasons attached — is part of the work. The lead time on a bespoke commission is the period between an approved brief and a piece arriving on site, installed. For most bespoke furniture it sits in the range of ten to twenty weeks. A discrete piece is faster, a full joinery fit-out or a piece carrying specialist craftsmanship is longer, and a complex hospitality FF&E package is longer still. This guide sets out what the time actually buys, how the disciplines compare, what stretches or compresses a programme, and how to brief early so the joinery, lighting and flooring all arrive on the day they need to.

What "lead time" actually covers

When someone quotes a bespoke lead time, they usually mean production — the weeks the piece spends on the bench. But that is only the middle of the story. From an approved brief, the work moves through six stages, each with its own pace, each able to run ahead or fall behind on its own.

So when a brief asks "how long does this take", the honest answer is the sum of all six, not just production. Treating them as one number is how programmes slip.

Indicative lead times by discipline

The table below sets out indicative ranges, measured from approved brief to installed piece. Read them as starting points, not promises: scope, finish, materials and any specialist craftsmanship all move the number, and the real figure for your piece comes out of a conversation, not a chart.

Discipline Typical range What sits at the long end
Single furniture piece (table, sideboard, cabinet)10–14 weeksHigh-gloss lacquer, figured veneers, leather lining
Upholstered piece (sofa, headboard, banquette)10–16 weeksSpecial-weave fabric, hide-matched leather, contract certification
Joinery fit-out (kitchen, library, dressing room, panelled room)12–20 weeksIntegrated lighting, glass, metalwork, multi-room coordination
Lighting (chandelier, sconce set)12–22 weeksMurano glass, crystal cutting, custom electrification
Timber flooring (parquet, end-grain, patterned)10–16 weeksCustom dimensions, oversized rooms, exotic species
Decorative craftsmanship (marquetry, gilding, hand-carving, verre eglomise, straw marquetry)16–28 weeksSampling complexity, panel size, multi-technique combinations
Hospitality FF&E package (full hotel, restaurant, members' club)24–40+ weeksRoom-count scale, phased delivery, certification, international shipping
"The honest answer is the sum of all six stages, not just production. Treating them as one number is how programmes slip."

What stretches a lead time

A few things reliably add weeks. Knowing which they are at brief stage is what lets a designer or specifier defend a delivery date rather than apologise for it later.

What compresses a lead time

How to brief early

Most lead-time problems are really briefing problems wearing a different coat. The single biggest lever a designer or developer holds is simply starting earlier than feels necessary — well before the moment it starts to feel urgent.

On a residential project, we ask to be brought in at the start of detailed design, not at first-fix. The joinery so often shares its walls, ceilings and floors with the structural and services packages that the earlier we are at the table, the better we can place sockets, switches and lighting circuits before the plaster closes over them. I have lost count of the times an early conversation has saved a chased-out wall later; the cost of asking us a question at design stage is a phone call, and the cost of not asking is sometimes a finished surface opened back up. On a hospitality scheme we ask to be briefed before tender, so the real material lead times are sitting in front of the design team before the programme is set in ink.

A working rule we find holds up: from the day the brief lands to the day a complete bespoke piece is installed, plan on roughly the same stretch of time as the design and consenting phase that came before it. Real schedules wander either side of that, but treating production as half of a project rather than a postscript is what usually keeps a programme intact.

Phased delivery for hospitality and large schemes

On hotel openings and large fit-outs, lead time stops being a single number and becomes a sequence. Furniture for the public areas, the guestrooms and the back of house each has its own production run, its own freight window and its own slot on the install calendar. We sequence the making to the opening programme: the first phase ships first, the workshop holds the second to a controlled handover date, and the install team moves in step with site progress. Where a piece is finished before its room is ready, it waits protected and climate-controlled — never propped in the corner of a half-built suite, gathering plaster dust and knocks.

The same thinking applies to a house that is running ahead in some rooms and behind in others. The right answer is almost never "ship everything at once" and almost always "match the production schedule to the room schedule", so each piece arrives into a space that is genuinely ready for it.

How we work with the trade

Make Bespoke Studio works as a manufacturing partner to interior designers, architects and developers. We build to your drawings, sample to your specification, make through our workshop network and install with our teams. Lead time is agreed at the start, reviewed every week, and held to — and if a date is slipping we would rather tell you in week three than in week twelve. Where a programme is genuinely tight, we will say plainly what is possible and what is not before any drawings are signed, because a date promised and missed is worse than a date declined honestly. The conversation about timing is part of the work, not a negotiation bolted on the side. For more on how we work with the trade, see our trade page, and for how cost and lead time pull on each other see our cost of bespoke furniture note.

Frequently asked questions

How long does bespoke furniture take?

Most discrete bespoke pieces take ten to fourteen weeks from approved brief to installation. Upholstered pieces sit in the same range or a little longer. Joinery fit-outs run twelve to twenty weeks. Pieces carrying decorative craftsmanship such as marquetry or gilding run sixteen to twenty-eight weeks, because the hand that makes them cannot be hurried. International freight adds three to seven weeks on top.

Why do bespoke lead times vary so widely?

Because the work passes through six independent stages: design, sampling, drawings, production, finishing, freight and install. Each can move at its own speed. A simple piece in a standard finish slips through all six quickly. A complex piece with specialist craftsmanship and international freight lingers in stages a simpler piece never touches at all — which is why two commissions that look alike on paper can land months apart.

What is the fastest way to commission bespoke furniture?

Lock the design at first sign-off, specify from a standard finish library, choose a piece that runs through a single workshop, and bring the maker in before the design is finalised so feasibility feedback can shape the brief while it is still soft. The first sample is more often the right sample than people expect. Chasing finish after finish is the most common reason a lead time quietly stretches.

Do specialist crafts always extend the lead time?

Yes. Marquetry, straw marquetry, gilding, hand-carving and verre eglomise all run through small specialist workshops, and the technique sets the pace, not the diary. A panel cannot be rushed without shedding the very qualities that made it worth commissioning — the time is not a delay, it is the thing you are paying for. Plan four to twelve additional weeks for any decorative-craft element.

How do I plan a hospitality FF&E lead time?

Brief the maker before tender. Confirm material and finish choices with full samples by the end of design development, while there is still room to move. Sequence the workshop programme to the opening sequence, not to a single end date. And build in two to four weeks of contingency before opening for snagging and the small, inevitable changes that only reveal themselves once the rooms are real — an opening week is a poor moment to discover you had none.